Application · two to five years

Pavement test sections

New mixes, thinner overlays, recycled materials and new joint designs only prove themselves under real traffic and real seasons. Instrumented test sections give the evidence for the next specification.

Why instrument a test section

Laboratory tests and design models are a starting point. How a pavement actually performs depends on the local climate, the local trucks and how the layers were built. A test section with two or more designs side by side, loaded by the same traffic, is the most direct way to compare them.

What to measure

How MT-16 is set up

Sixteen ports cover two lanes with identical sensors on one logger. All channels are sampled on one clock, so when a truck crosses both sections its response can be compared axle by axle. Slow data such as temperature is logged between events, and everything is uploaded daily.

What you get

Related

Have a site in mind?

MT-16 is in its pilot program. Tell us about your road, test section or construction project.

Join the pilot program