Application · late winter and spring

Spring load restriction monitoring

Every spring, thawing roads lose much of their strength for a few weeks. Measured data shows when the weak period starts and when the road has recovered, so restrictions can follow the road instead of the calendar.

The problem

In cold regions the ground freezes deeply over winter. When it thaws, it thaws from the top down: the upper layers turn wet while the soil below is still frozen and water cannot drain away. Until the frost has gone and the layers have drained, the pavement is at its weakest and heavy axles do far more damage than usual.

Many agencies therefore restrict heavy loads on vulnerable roads each spring. The start and end dates are often fixed in advance or set by experience. Lifting too early damages the road. Lifting too late holds up local freight, farming and construction.

What to measure

How MT-16 is set up

One MT-16 at the roadside carries the temperature string, a few strain probes in the wheel path and a weather sensor. Temperatures are logged on a schedule; truck passes are captured as events. Every morning the data arrives by cellular network, so the thaw can be followed from the office through the whole restriction period.

What you get

Related

Have a site in mind?

MT-16 is in its pilot program. Tell us about your road, test section or construction project.

Join the pilot program